Tomorrow’s Reserve

20% greener on paper.7,000 m³ short by midnight.

A plan can look greener just by not refilling the tank. Tomorrow’s Reserve checks the whole day, and a smart contract refuses claims that don’t hold water.

Check a planRecorded runs from a local EVM

The rule: a plan can’t claim a carbon saving by leaving tomorrow’s water missing. Here, the tank must be back at 12,000 m³ by midnight.

1Choose a pumping plan

Upload or edit a plan
Start
12,000 m³
Minimum
4,000 m³
Capacity
24,000 m³
Pump
6,000 m³/h

Values are never repaired. A CSV in m³ is converted exactly to litres; anything ambiguous is rejected.

2The whole day

3Ask the contract

Re-checks every hour, then accepts or refuses the claim.

Across 25 days

Skipping the refill makes the saving look 3.9× bigger than the honest rule. No depleted plan qualifies.

Modelled attributed CO₂ reduction over 25 simulated February days, including failed days. The AI and weekly rows are numerical checks; both rule plans were also run on the contract. The AI plan’s smaller safety margins do not prove equal safety.

How it’s used

  1. Utility analystUploads yesterday’s hourly pumping as a CSV.
  2. Smart contractChecks the whole day. Accepts with a receipt, or refuses with the reason.
  3. Auditor or lenderDownloads the evidence, re-runs the verifier, then relies on the claim, for example in an emissions report or a loan target.

Proposed next step: a read-only shadow trial alongside a utility’s own pump, energy and tank meters. Not yet done.

What this does not claim

Full details: docs/submission/trust-note.md in the repository.